Notice: This site is an early preview and may include errors or omissions. Verify against official sources and do not rely on this site alone when making decisions.
Notice: This site is an early preview and may include errors or omissions. Verify against official sources and do not rely on this site alone when making decisions.
SITEMAP.XML • HE
SITEMAP.XML
Validity
HE
תקפות
[Y] [The race committee] [The technical committee] [The protest committee] failed to deliver the protest within [two hours] [xx hours] after receiving the relevant information, as required by RRS [60.3(b)(2)][60.3(b) and SI(xx)]. [There was no good reason for the PC to extend the time limit.] [However, there was good reason for the PC to extend the time limit.] Therefore the protest is [valid] [invalid] under RRS 60.4(a)(1).
[Y][ועדת התחרות][ועדה טכנית][ועדת הערעורים] כשלה מלהגיש את הערעור בתוך [שעתיים][XX שעות] אחרי שקיבלו את המידע הרלוונטי, כפי שנדרש בחוק [60.3(b)(2)] [נספח הוראות שייט סעיף(XX) ו-60.3(b)].[לוועדת הערעורים אין סיבה טובה להאריך את זמן הערעורים][למרות זאת לוועדת הערעורים הייתה סיבה טובה להאריך את זמן הערעורים] לפיכך הערעור [תקף][לא תקף] על פי חוק 60.4(a)(1).